267 - Attendant Operated Entrance Installation Guide
Contents
1. FORWARD 1
2. ELEVATOR CONTRACTOR RESPONSIBILITIES 1
3. BEFORE STARTING INSTALLATION 1
4. JOB NUMBER IDENTIFICATION 2
5. HANDING 2
6. BIPARTING LANDING DOOR INSTALLATION 3
6.1. GENERAL 3
6.2. DOOR GUIDE RAILS TYPES 3
6.3. DOOR GUIDE RAILS - LOCATION 4
6.4. DOOR GUIDE RAILS – INSTALLATION 5
6.5. DOOR SHEAVES INTERLOCKS & OTHER COMPONENTS 6
6.6. DOOR PANELS 6
6.7. LOWER PANELS 6
6.8. UPPER PANELS 7
6.9. DOOR CHAINS, CHAIN RODS & TENSION LATCHES 7
6.10. TO ADJUST DOOR CHAINS AND DOOR PANELS IN THIS ORDER: 8
6.11. ADJUST PANEL BETWEEN GUIDES 9
6.12. DOOR SIDE TENSION LATCHES 9
6.13. FOR INTERLOCKS COMPONENTS AND SILLS, OPERATORS AND OTHER
COMPONENTS, REFER TO SECTIONS 23.6 TO 23.9 9
7. FLOOR HEIGHT CHECK 10
8. CAR CLEARANCE CHECK 11
9. AVERAGE OPENING CENTERLINE 12
9.1. MARK JAMB POSITION AT EACH FLOOR 12
9.2. AVERAGE OPENING CENTERLINE 12
10. LOCATING CENTER OF THE OPENINGS 13
10.1. POSITION THE CENTER OF THE GAUGE ROD ONTO THE AVERAGE OPENING CENTER
LINE. 13
10.2. NEXT TRANSFER THE DBG TO THE PLATFORM. 13
11. BUILDING SILL LEVEL CHECK 14
11.1. LEVEL THE SILL 14
11.2. IDENTIFY LOWEST SIDE 14
11.3. POSITION THE RAIL 14
12. DOOR GUIDE RAIL INSTALLATION - OVERVIEW 15
13. RAIL INSTALLATION POSITIONING 16
14. RAIL BOLTING 17
14.1. LOWEST RAIL BOLTING 17
14.2. SHIM RAIL AS NECESSARY. 17