1. FORWARD 1
2. ELEVATOR CONTRACTOR RESPONSIBILITIES 1
3. BEFORE STARTING INSTALLATION 1
4. JOB NUMBER IDENTIFICATION 2
5. HANDING 2
6. SLIDE-UP LANDING DOOR INSTALLATION 3
6.1. GENERAL 3
6.2. DOOR GUIDE RAIL TYPES 3
6.3. DOOR GUIDE RAILS - LOCATION 3
6.4. DOOR GUIDE RAILS – INSTALLATION 4
6.5. DOOR OPERATORS INTERLOCKS & OTHER COMPONENTS 5
6.6. DOOR PANELS 5
6.7. UPPER PANEL 6
6.8. MIDDLE PANEL 6
6.9. LOWER PANEL 6
6.10. COUNTERWEIGHT INSTALLATION 6
6.11. DOOR CHAINS & CHAIN RODS 6
6.12. TO ADJUST DOOR CHAINS AND DOOR PANELS 8
6.13. ADJUST PANEL BETWEEN GUIDES 8
6.14. FOR INTERLOCKS, OPERATORS AND OTHER COMPONENTS 8
7. DOOR ASSEMBLY 9
8. FLOOR HEIGHT CHECK 10
9. CLEARANCE CHECK 11
10. AVERAGE OPENING CENTERLINE 12
10.1. MARK JAMB POSITION AT EACH FLOOR 12
10.2. AVERAGE OPENING CENTERLINE 12
11. LOCATING CENTER OF THE OPENINGS 13
11.1. POSITION THE CENTER OF THE GAUGE ROD ONTO THE AVERAGE OPENING
CENTERLINE. 13
11.2. NEXT TRANSFER THE DBG TO THE PLATFORM. 13
12. BUILDING SILL LEVEL CHECK 14
12.1. LEVEL THE SILL 14
12.2. POSITION THE RAIL 14
13. GUIDE RAIL INSTALLATION - OVERVIEW 15
14. RAIL INSTALLATION 16
15. RAIL BOLTING 17
15.1. RAIL BOLTING 17
15.2. SHIM RAIL AS NECESSARY. 17
15.3. IN ORDER TO KEEP RAILS PLUMB AND MAINTAIN THE CORRECT CAR CLEARANCE USE “0629 RAIL SHIMS”. 17
16. HOW TO USE GAUGE ROD - OVERVIEW 18
17. RAIL INSTALLATION - OPPOSITE SIDE 19
18. SPREADER INSTALLATION 20
19. ATTACH CLIP ANGLES TO WALL 21
20. OPERATORS 22
21. PLUG ROD INSTALLATION 23
22. INTERLOCK INSTALLATION 24
23. POSITION ENCODER INSTALLATION 25
24. PANEL INSTALLATION 26
24.1. INSTALL A HOIST OR CHAIN FALL 26
24.2. POSITION PANEL CRATE AND CONNECT STRAPS 27
24.3. LIFT PANEL AND REMOVE CRATE 28
24.4. ROTATE THE PANEL 29
24.5. HOIST THE PANEL INTO POSITION 30
25. INSTALL THE UPPER DOOR PANEL 31
26. INSTALL THE MIDDLE DOOR PANEL 32
27. LOWER PANEL INSTALLATION 33
28. COUNTERWEIGHT INSTALLATION 34
29. CHAIN SUSPENSION OVERVIEW 35
30. CHAIN CONNECTION DETAIL 36
31. LOWER PANEL ROPING 37
32. MIDDLE PANEL ROPING 38
33. UPPER PANEL ROPING 39
34. RATCHET PIECE 40
35. PULL STRAPS (MANUAL OPERATION) 41
36. FILLER ANGLES 42
37. EMERGENCY UNLOCKING DEVICES 43
38. MASTER LIMIT CAM 45
39. DOF (DOOR OPEN FINAL LIMIT) 46
40. MICRO SWITCH LIMIT ARRANGEMENT 47
41. FINAL ADJUSTMENTS 48
41.1. OPERATOR ADJUSTMENT 49
41.2. LEVEL THE PANELS 50
41.3. SIDE TO SIDE PLAY 51
41.4. INSTALL KEEPER HOOK, UPPER PANEL HOOK AND SET POSITION OF THE INTERLOCK 52
41.5. PIN THE INTERLOCK 53
41.6. PIN THE INTERLOCK 53
41.7. ADJUST THE DOOR CLOSE CAM AND KICK-OUT ARM 54
41.8. SET THE ROLLER ARM 55
41.9. TAMPER RESISTANT PLUGGING DEVICE 56